Working
Environmental Condition:Temperature: 10℃~40℃ Relative
Humidity: 30%~75% Atmospheric Pressure: 70~106 kPa
Transportation & Storage Environmental
Condition:Temperature: -15℃~70℃ Relative Humidity:
≤80% Atmospheric Pressure: 50~106 kPa
5.There
is a glass X-ray tube in the component part. So it
should be carried and installed with care to prevent
the tube being damaged.
6.According to the regulation of the state, the
installation, adjustment, and operation of the
component should be carried out be professionals with
qualification.
Adjustment & Maintenance
1.
Matters Needing Attention for Adjustment
1)Check the high voltage generator that provides the
component part with power supply to see if it
generates centre earthing single-phase or three
phase full-wave switching high voltage supply
2)Make
sure to switch off the beam machine or lay effective
cover-device at the ray window of the component part
in order to avoid damage caused by X-ray radiation
during adjustment.
3)Make
sure the power supply for the filament and stator
complies with the index of them.
4)Check if the time relay and testing devices such
as meters possess adequate precision.
5)No
load of cold high (no tube circuit)
6)Adjust the filament circuit as carefully as
possible to the proper tube circuit to prevent the
filament from being burnt. The filament circuit
should be kept below 5.5 A of all times.
2.
Treatment before the first operation
The
operation should follow the following procedures if
the component part is operated for the first time or
deposited for over a month before re-use.
1)With
the tube circuit kept 2mA, increasing the tube
voltage gradually from 50 KV to the rated voltage
(125kV)at a speed of less than 10kV/min and keeping
it at the rated voltage for 3 minutes.
2)Rest
the component part for 5minutes after unloading.
3)According to the load characteristic diagram
(diagram 2), the tube circuit should be half of the
corresponding circuit of the tube voltage. The
exposure intermittence time should be 0.1 second.
From 60 KV, expose once or twice every 0.1 second
then increase the voltage by 10 KV and continue to
expose till the voltage gets 125 KV. (Pay attention
to check if the X-ray tube works normally) The time
between two exposures shouldn’t be less than 1
minute so as to cool the component part.
4)During
loading, if the tube circuit is unstable, reduce the
tube voltage (10KV or so) immediately until the tube
circuit gets stable and keep it for about 2 minutes
before continuing to increase the tube voltage to the
rated value.
Before
using the component part, make sure the following
operations are completed.
1)With
the tube circuit kept 2mA, increasing the tube
voltage gradually from 50 KV to the rated voltage
(125kV)at a speed of less than 10kV/min and keeping
it at the rated voltage for 3 minutes. (The rated
tube voltage should be reduced properly after
approximately half a year’s use.)
2)Rest
the component part for 5minutes after unloading.
3)According to the load characteristic diagram
(diagram 2), the tube circuit should be half of the
corresponding circuit of the tube voltage. The
exposure intermittence time should be 0.1 second.
From 80 KV, expose once every 0.1 second then
increase the voltage by 10 KV and continue to expose
till the voltage gets 125 KV. (Pay attention to
check if the X-ray tube works normally) The time
between two exposures shouldn’t be less than 1
minute so as to cool the component part.
4)During
loading, if the tube circuit is unstable, reduce the
tube voltage (10KV or so) immediately until the tube
circuit gets stable and keep it for about 2 minutes
before continuing to increase the tube voltage to the
rated value.
4.During adjustment, stop loading and get the
component fully cooling when the tube wall
temperature is too high (70℃). If the temperature
controlling switch is used, it will be switched on
when the temperature of the component is too high
and cut off the tube voltage
5.Clean the surface of the component with absolute
alcohol and maintain the component part
periodically. Replace the insulating oil in the
interface of the high voltage cable. Check earthing
and temperature switch and make sure there is no
leakage in the body case of the component part.
6.
Please contact us if the component part goes wrong and
needs maintenance.
Quality Assurance
1.The guarantee period of this component part is 18
months; among which 12months is normal use guarantee
(the first between 18 months since the purchase day
and 12 months since installation).
2.We offer free maintenance and replacement of the
component part for any fault caused by manufacturing.
3.The customer should return the quality information
to us within the second month after receiving the
component part. Otherwise, the customer will be
showing their approval of the quality.
4.We only take care of the direct loss of the
component part.